Terms as usual are:
• EX-WORK PRICES
• PACKAGING INCLUDED
• PAYMENT TERMS – USUAL ALLIED METALS TERMS
Not included …………..
• COLOR (IF, ALTHOUGH NOT BEEN SPECIFIED IN A SECOND STAGE MIGHT BE REQUIRED) TO BE ADDED
• SEPARATION OF THE UNIT (IN CASE SITE CONDITION DO NOT ALLOW TO GO IN WITH ONE SINGLE PIECE) TO BE CALCULATED …. APPROX 2.000€ FOR EACH UNIT
• OUR ENGINEER ON SIDE IN CASE YOU TECHNICALLY NEED HIM ALSO NOT TO BE ADDED