Perform, before it is needed, the required change of an object (either fully or partially).
• Pre-pasted wall paper
• Sterilize all instruments needed for a surgical procedure on a sealed tray.
Pre-arrange objects such that they can come into action from the most convenient place and without losing time for their delivery.
• Kanban arrangements in a Just-In-Time factory
• Flexible manufacturing cell - See more at: http://www.triz40.com/aff_Principles_TRIZ.php#sthash.s3rL8mmK.dpuf