Regarding the occurrence of electric power outage or trips at Bang Na office. The team has coordinated with the security team of 21-Design technicians to analyze the causes and find ways to prevent and address from an initial examination found no abnormalities MDB control box, the technical assumption seems to be a problem caused by the dislocation of the Phase Protection who made the previous electric power trip case of a power cut or exceeding guidelines.