For buildings in dry climate with high SHR, the total cooling load was low, but up to 45% electricity of AC system could be saved in Boulder because the chiller COP could be significantly improved during more than 70% operation time.
For buildings in dry climate with high SHR, the total cooling load was low, but up to 45%electricity of AC system could be saved in Boulder because the chiller COP could be significantly improved during more than 70% operation time.