The attachments are the documents what you need. But the Contractor need some documents and parameter about water tower and the equipment of control system as follows:
1. the water tower equipments list and the equipment parameters.
2. the layout of the water tower and electrical schematic diagram.
3. The requirements of the water tower power supply and communication with our connector.