The weep holes are provided on the side concrete panels and the bottom slabs of the secondary canals as shown in Figure 16. During construction, some side concrete panels were displaced as shown in Photo 10 due to high seepage forces acting behind the panels. The remedial measures were to place stones behind the concrete panels for easy release of water pressure at the back of the panels.