Secondary effluent from the wastewater treatment plant was
monitored for eight months, from May 2001 to January 2002, as
summarized in Table 2. Alkalinity, pH, and DO were measured on a
daily basis for evaluating nitrification and denitrification. Also, other
parameters such as TN, NH4–N, NO2–N, and NO3–N were measured
two or three times per week to calculate nitrogen removal. All the
Secondary effluent from the wastewater treatment plant wasmonitored for eight months, from May 2001 to January 2002, assummarized in Table 2. Alkalinity, pH, and DO were measured on adaily basis for evaluating nitrification and denitrification. Also, otherparameters such as TN, NH4–N, NO2–N, and NO3–N were measuredtwo or three times per week to calculate nitrogen removal. All the