Study and optimization of Body Shop Layout based on Jobs per Hour Production requirements and future upcoming new vehicle models.
Beam-Column Structural Design - development and its analysis.
New material handling concept implementation to meet Global Manufacturing system facilities requirements with comparatively difference between previous system and lately material handling concept.
Optimization in Facilities readiness for BIW Manufacturing.
Cost reduction in various machines and tooling through technical study and analysis.
Crucial Issues faced and resolved during New Body Shop Facilities readiness,manufacturing,and tryout phase.