Identify the person who reponse for recheck and turn off the hot melt unit
Set up method for adhesive drain before start
Set standard pump speed and take off the pump adjtable switch (Pump adjust by MT)
Install auto water drain at air tank
PM review for hot melt unit and implement (Schedule)
Contact to Gule supplier for the information of Material and glue packaging melting point
Method for turn on and off the machine for Melting unit)
Method for turn on and off the machine (All machine)
Change type of regulator