Due to in 11 August, 2014. Geotechnical team was informed from mine operation that about flooding at toe slopes of the waste dumping area in the West Sub-pit as shown in Figure 1. Found that water flooding approximately of 1 m height. Because the effect of rainfall in July to beginning of August 2014. The detail is shows follow;