Planing Work: Check Shop Dwg. Steel Door.
Office Flaming Elevation.
Rebar Work.
Rebar Slab Work., Drop Panel Work, CB Wall Toilet.
Rebar Slab Work Utility Area.
Drainage Lab Utility MH Set Up.
Safety control Site and Safety Patrol.
Casting Concrete Road.
Check Level Rebar for Casting Concrete.