As reported in paragraph 2.4, after the generation of the
particular SBBGR biomass, the HRT was progressively reduced
down to 11 h by increasing the hydraulic loading (i.e., by
increasing the wastewater volume fed to the plant). Reactor
performances (in terms of average values standard deviation,
and value range) recorded at this value of HRT are
summarized in Table 1.