There will always be a dispersant load at the end of each sortie but not necessarily a fuel
load. There is also the consideration of a simultaneous fuel/dispersant load which may be
plan dependant. For these reasons the time per sortie calculation does not include loading
of fuel or dispersants. It is the summation of only those time elements necessary to go
“out and back.”