sCOPE – GENERAL
The scope of work for PPP Co in respect of the Maintenance Facility Works includes but is not
limited to the following:
(a) obtain all Approvals other than the Planning Approval (but subject to clauses 7.3 and 7.4 of
the Conditions of Contract);
(b) carry out any necessary investigations and searches;
(c) carry out all required design;
(d) prepare all required Design Documentation; and
(e) undertake all construction, testing and commissioning.
Without limiting any other provision of the Contract in respect of PPP Co’s design or safety
obligations (including clause 4.6.2 of the Contract Management Requirements), PPP Co must
ensure that the safeworking requirements for access to the suburban and main lines (including
emergency access during the Delivery Phase) can be achieved with the PPP Co design and
RailCorp may reject PPP Co’s design if this requirement is not satisfied.
Double Deck Trains