Installation Procedure
Having established the correct position for the machine, taking into consideration water and electrical
supplies, drain connection and the overflow indicator, follow the procedure below:
1. Position the template
Place the template in the desired position on the floor.
CAUTION: Before drilling, check & position the template to ensure that
the holes do not affect under floor heating or other services.
2. Drill holes
Place the floor locating bracket in the position indicated on the template and
drill the fixing holes. Ensure the template is not moved while drilling.
3. Remove template
Remove the template and replace the floor locating bracket.
4. Secure the bracket
Using the desired floor fixing fasteners (not supplied) bolt the floor locating bracket to the floor. Ensure
the floor locating bracket is fitted the correct way round as indicated on the template.
5. Position
Position the machine close to the floor locating bracket and being careful not to damage the floor
gasket, move the machine over the bracket and locate the bracket into the recess in the floor of the
machine.
6. Front Panel & Control Box
Slacken the two front panel screws and remove the front panel. Undo the screws which fix the
electrical control box bracket to the machine floor and move the control box to one side to allow
access to the floor fixing bolt.
7. Bolt Machine to the Bracket
Secure the machine using the mounting base bolt, spring washer and sleeve to fix the machine in
position. Secure the control box in its original position in the machine with the two screws and connect
the services as follows:-
• Make the waste connection from the internal 'P' trap (to mains sewage only). Ensure that connecting
pipe is cut square and deburred before fitting, to prevent the waste snagging within the pipework and
restricting the flow.
• The cistern overflow indicator pipe discharge should remain visible to indicate an overflow condition.
If necessary a tundish plumbing device should be purchased and fitted to direct overflow water to a
drain.
• Connect the mains cold water inlet supply. Open the inlet isolating valve.
• Connect the flying lead supplied ready fitted to the machine, to the installation isolator. Note advice on
electrical information Ref: page 15.
• Turn on the electrical supply. The inlet solenoid valve opens to admit water to the cistern. Using the
information in the maintenance manual, Ref: page 14. will ensure the correct flow restrictor is fitted
(if required) for your supply, which must be fitted immediately. The machine has a 3 mm restrictor fitted
as standard when leaving the factory.
• Continue with commissioning the machine. The rotational direction of the machine is correct on leaving
the factory.
8. Fit front panel
Refit the front panel and secure with the two front panel screws.