As meeting on 13 October 2014, PISA (represent by Khun Chucheep) acknowledged and will accelerate to protect water ingress at level 18. There was the rainy On 21 October 2014, the corridor area at level 16 which is interior mock up. There was having effect from the water leak due as PISA water leak protection system is failed as reference 1.
We are request to PISA to fix as soon as possible to protect which celling installation work that will start in the beginning of November 2014 and we are pleased to inform you that we will charge you if have any damage from the water leak above.