Dear Team,
Please be kindly informed agenda of tomorrow meeting as herewith;
1.0 Introduction of each company regarding responsibility and Scope of Services. (PAL)
2.0 Presentation of EIA Consultant for the requirement of documents and design drawings / calculations etc for completing the EIA Report. (Environmental Technology)
3.0 The EIA Report should cover the Demolition Part and the General Part as required by the EIA standard and good for this project. (PAL / Dr. Prapat / Environmental Technology)
4.0 The Requirement and Timeline for each Designer:
4.1 Architect (IA)
4.2 Structural Engineer (Dr. Prapat)
4.3 MEP Designers (Khun Supat of 535)
5.0 To agree The Timeline for the EIA Consultant to complete the Full Report and documents for submission to PCH. (Environmental Technology)
6.0 Any documents required from the Client (BH) (Environment Technology)
7.0 Weekly Monitoring schedule. (PAL and ALL)
8.0 AOB
Best regards,
Chettha