The diameter of the temporary steel casing minimum is 35 cm. The length of each temporary casing is 1.2 meters. Each casing will be connected and secured by coupling system. The casing will be drilled and lowered into soil by the cylindrical hammer. During the drilling process, soil will be removed through center core of casing. Once the designed depth is reached, reinforcement cage will be installed into the bored hole