Attached are the layout of Building B and Spa that we would like to have confirmation from both of you. In spa building, from the parking area at the basement, there are 3 doors as the entrance to the reception area (cloud with red). In P49 drawings, those doors are not interior scope, but also in A49 drawings, we cannot find the design of those doors. Other things are ADD and Check in ceiling design. There are no ceiling design of those areas both in A49 and P49 drawings. Please let us know who's scope is it? If those are Architecture responsibility, please Torsak give us the design intent. Thank you