The most detailed and accurate method (+/- 10%).
The estimator prices materials, shipping costs, taxes, labor separately for each item and then adds up the totals for the items.
Takes considerably longer & requires complete information about the project.
Suited for preparation of construction bids and for securing furnishings bids.