The coefficients on all control
variables, except SRVIND and RESTATE, are significant at conventional levels with the expected signs.7
For the audit committee control variables, the coefficient on ACSIZE and ACIND are not significant.8 Consistent
with CHR (2005), the coefficient on ACBUDGET is positive and significant.