The attained t-values in Table 1 show that the difference in ratings is significant for majority of the items. Although descriptively, the results fall into the same categories, the analysis of the figures showed significant differences in the paired t-test and the mean before and after the strategic planning intervention. Thus, it can be determined that the strategic planning workshop and monitoring meetings conducted after the strategic planning were successful to a certain extent with ten out of 13 items rating significant after the intervention was conducted.