Diversion structures can also be installed
in the drainage network upstream from the
facility to be taken off-line . In piped systems,
a control box structure (Figure 330-
50) is used . In open channel systems, a
check dam can be set diagonally to divert
the WQV to the treatment facility and
bypass excess flows over the dam .
Drainage network diversions may be sized
by the following procedure :