Installed emergency light at ground floor and second floor in common area. See picture 10.
2. Set up earth connection to water pump. See picture 11.
3. Set up earth connection to refrigerator and dish washer. See picture 12.
4. Install 10 sqmm. THW. With 10-mA, 32-A GFCI for hot water unit in bed# 3.
5. Test GFCI operation on receptacles in wet area. See picture 13.
Picture reference
Picture 1
Picture