Execution of high risk contract work
Besides all the items under 4.3, the following needs to be implemented strictly during the execution period of high risk work.
The HSSE personnel shall go to the contract work site to conduct the physical inspection by using the respective inspection checklist to ensure the HSSE requirements before the Permit-To-Work is released. (The PTW shall be posted at the work area)
If the inspection checklist is not available for a new high risk work, the checklist has to be prepared first based on the work risk assessment before the site physical inspection is carried out.
No high risk contract work will start without green light given by HSSE personnel.
If PTW is for multiple days, all the requirements in PTW form and the specific checklists have to be reviewed and the site has to be inspected every day before the job start to ensure there is no new hazard or condition changes at the workplace since last day.
The HSSE personnel have the right to issue stop work order to put the contract work on hold at any time whenever deemed necessary.