Just before 8 am on Aug. 17, 2009, workers on the morning shift stepped off a clattering
Soviet-era tram and made their way past security and into position at the SayanoShushenskaya
hydroelectric power plant in south-central Siberia. In the 950-foot-long
turbine hall, custodians mopped the stone floors and supervisors handed out assignments.