According to the survey and information received from MBI, at present
the time taken to collect the waste in the selected routes is near 2 hr (6934 s). This indicates the improvement of
collection time in the new design compared to current situation. The total length of 2332 s was saved in new route
design as the collection duration was reduced from 6934 s to 4602 s.