Abstract
The research aims to develop preparation process composition Stir cream for Production of buns. Steamed buns are best sellers of CPRAM Co.,ltd. The search application To increase productivity and reduce steps. In the process of drilling the fresh milk of the process of preparation of the raw material in the process of filling cream stir steamed. By using the principles of work, such as the fundamental principle of the wasteland. To minimize the wasteland with the ECS principle to eliminate losses all seven reasons (7 Waste), etc.
The experimental work equipment Drilling canned fresh milk 10 caned by using the flow chart of the process work. It was found that the process of work of the employee the decrease from the 33 steps before updating reduced 18 steps. And reduced working time from before the update is located at 150 seconds, or roughly 15 seconds/canned reduced 62.5 seconds. Or about 6.25 seconds/caned reduce the time down to 87.5 seconds. And the cost of the employee's wage 146.25 baht/day 3, 802.5 baht/month 45,630 bath/year. That will reduce the employee's wage costs down. 204.42 baht/day 5,314.92 baht/month 63,779.04 bath/year. And the costs of preparing a prototype at 33,144 baht.
The break-even point of the prototype is 6.24 months
Key words:
Abstract The research aims to develop preparation process composition Stir cream for Production of buns. Steamed buns are best sellers of CPRAM Co.,ltd. The search application To increase productivity and reduce steps. In the process of drilling the fresh milk of the process of preparation of the raw material in the process of filling cream stir steamed. By using the principles of work, such as the fundamental principle of the wasteland. To minimize the wasteland with the ECS principle to eliminate losses all seven reasons (7 Waste), etc. The experimental work equipment Drilling canned fresh milk 10 caned by using the flow chart of the process work. It was found that the process of work of the employee the decrease from the 33 steps before updating reduced 18 steps. And reduced working time from before the update is located at 150 seconds, or roughly 15 seconds/canned reduced 62.5 seconds. Or about 6.25 seconds/caned reduce the time down to 87.5 seconds. And the cost of the employee's wage 146.25 baht/day 3, 802.5 baht/month 45,630 bath/year. That will reduce the employee's wage costs down. 204.42 baht/day 5,314.92 baht/month 63,779.04 bath/year. And the costs of preparing a prototype at 33,144 baht. The break-even point of the prototype is 6.24 monthsKey words:
การแปล กรุณารอสักครู่..
