For this analysis, it is assumed that the efficiency of the gen-set is 35%, and speculatively that the generator runs 345 days per year, 24 h per day, allowing for 20 days of downtime. With these assumptions the gross revenue from electricity generation that size of farm can expect is calculated based on the Ontario FIT schedule. These results are tabulated in Table 4.