Design modifications: are planned and scheduled and they depend on eliminating the cause of repeated breakdowns.
Scheduled overhaul and shutdowns of the plant: planned and scheduled in advanced.
Overhaul, general repairs, and replacement: planned and scheduled in advanced.
Preventive maintenance: planned and scheduled in advanced.