Dear Khun Phuckphong,
Not a good news, we are advised that PAE has rolled 10213887 from YM Keelung 069N ETD 14.01.2016 to OOCL Panama 154, ETD 21.01.2016 ETA 20.02.2016.
This is due to:-
- Overweight issue as PAE had the operational loading restriction for the YM Keelung
- There was an Industrial action last week at Patricks terminal from 8th to 11th half day (the receival period for YM Keelung)
- Patricks will do an Industrial action again on 18th till 19th half day across the Patricks terminal Australia, also, the tug boat engineer also strike across Australia on 12th and 13th, these might contribute to the delay of the vessel arrival at Singapore and eventually miss the connection of 1st feeder vessel.
Our team has requested PAE to prioritize 10213887 to load on the 1st feeder, ETA BKK 15.02.2016. If not possible and both 10213887 & 10213888 happen to reach at the same time, please advise an extra free detention and demurrage Muang Thong needs so we can negotiate with PAE.
We regret for the inconvenience may cause, please convey above info to your product team for their preparation.
Should further information need, please contact me. Thank you.
Dear Khun Phuckphong,Not a good news, we are advised that PAE has rolled 10213887 from YM Keelung 069N ETD 14.01.2016 to OOCL Panama 154, ETD 21.01.2016 ETA 20.02.2016. This is due to:-- Overweight issue as PAE had the operational loading restriction for the YM Keelung- There was an Industrial action last week at Patricks terminal from 8th to 11th half day (the receival period for YM Keelung)- Patricks will do an Industrial action again on 18th till 19th half day across the Patricks terminal Australia, also, the tug boat engineer also strike across Australia on 12th and 13th, these might contribute to the delay of the vessel arrival at Singapore and eventually miss the connection of 1st feeder vessel.Our team has requested PAE to prioritize 10213887 to load on the 1st feeder, ETA BKK 15.02.2016. If not possible and both 10213887 & 10213888 happen to reach at the same time, please advise an extra free detention and demurrage Muang Thong needs so we can negotiate with PAE. We regret for the inconvenience may cause, please convey above info to your product team for their preparation. Should further information need, please contact me. Thank you.