Where Ng (jlasheslkm2Iyr) is the ground flash density
which can be given by (3), L (m) is the length of
transmission line, Ie (kA) is critical current required for
flashover, Im(er (kA) is the maximum shielding failure
current, flI) is the probability density function of the