Structure of This Document
This document consists of the following parts:
•Part A: Overview
This part describes how to read this document, various types of CENTUM VP setup tasks along with their workflows, and hardware and software requirements.
•Part B: New Setup
This part explains the procedures for setting up each station.
•Part C: Maintenance
This part describes maintenance tasks that are required after the stations have been set up and went into operation.
•Part D: Connection with Other Products
This part describes the required settings when connecting CENTUM VP with other YOKOGAWA products, such as ProSafe-RS, PRM, and Exaopc.