Thank you for waiting. Please see the draft quotation as attached then the official offer, Specification and Drawing will send to you very soon.
This price was reference to the load list as attached, for make sure please check and confirm with your machine supplier.
Because the quantity and type of load control voltage 230 V would affect to the transformer