The planning process within the single modules is
standardized, which leads to significant time savings in
factory planning projects. The required information of the
single modules is linked by particular dependencies. The
visualization and analysis of these dependencies lead to a
higher transparency within the project. E.g. if changes occur,
the project team can directly trace the changes and effects on
the specific planning modules by analyzing the dependencies
between input and output information of different modules