5.1.4. Installat ion Costs
5.1.4.1. MOORING
Mooring will require one day per cable line, based on
an estimation by Vryhof. The mooring can be done using
a large anchor-handling vessel, costing approximately
$18,000 USD per day as of 2012 (Overview of the Offshore
Supply Vessel Industry, 2012), while a large ocean-going
barge is estimated to be around $20,000 USD. Since the
steel transportation reels of the mooring ropes have a diameter
of 5 m, and a flange diameter of 4 m (for a 2000
m rope), a large barge with a deck area of at least 2250
m² (e.g. 32 by 70 m) will be sufficient to store all mooring
lines. However, it may be more cost-effective to use multiple
smaller barges instead. The total mass of the cables
is around 7200 MT, which is well in limits of large ocean
barges.
In terms of operation time, it has been estimated by Vryhof
Anchors that it takes one day to install a single mooring
lime. A total of 30 mooring points are required for The
Ocean Cleanup Array (29 for the booms, and 1 for the
platform), meaning a total deployment time of 90 days.
However, transportation time to and from location must
also be taken into account.
For decommissioning these costs are assumed to be the
same as for installation.
5.1.4. Installat ion Costs5.1.4.1. MOORINGMooring will require one day per cable line, based onan estimation by Vryhof. The mooring can be done usinga large anchor-handling vessel, costing approximately$18,000 USD per day as of 2012 (Overview of the OffshoreSupply Vessel Industry, 2012), while a large ocean-goingbarge is estimated to be around $20,000 USD. Since thesteel transportation reels of the mooring ropes have a diameterof 5 m, and a flange diameter of 4 m (for a 2000m rope), a large barge with a deck area of at least 2250m² (e.g. 32 by 70 m) will be sufficient to store all mooringlines. However, it may be more cost-effective to use multiplesmaller barges instead. The total mass of the cablesis around 7200 MT, which is well in limits of large oceanbarges.In terms of operation time, it has been estimated by VryhofAnchors that it takes one day to install a single mooringlime. A total of 30 mooring points are required for TheOcean Cleanup Array (29 for the booms, and 1 for theplatform), meaning a total deployment time of 90 days.However, transportation time to and from location mustalso be taken into account.For decommissioning these costs are assumed to be thesame as for installation.
การแปล กรุณารอสักครู่..
5.1.4 . ค่าใช้จ่าย installat ไอออน5.1.4.1 . ที่จอดเรือเรือจะต้องมีหนึ่งวันต่อสายเคเบิลตามการประเมินโดย vryhof . ขึ้นสามารถทำได้โดยใช้สมอเรือขนาดใหญ่ใช้ต้นทุนประมาณ$ 10 , 000 USD ต่อวันของปี 2012 ( ภาพรวมของต่างประเทศอุตสาหกรรมเรือจัดหา , 2012 ) ในขณะที่มหาสมุทรไปใหญ่เรือคาดว่าจะอยู่ที่ประมาณ $ 20 , 000 USD ตั้งแต่เหล็กเพลาเรือขนส่งของเชือก มีเส้นผ่าศูนย์กลาง5 เมตร และเส้นผ่านศูนย์กลางของหน้าแปลน 4 M ( สำหรับ 2เมตร เชือก ) , เรือขนาดใหญ่ พร้อมดาดฟ้า พื้นที่ไม่น้อยกว่า 2 , 250พนักงานขาย ( เช่น 32 เมตร 70 เมตร ) จะเพียงพอที่จะเก็บเรือทั้งหมดเส้น แต่มันอาจจะคุ้มค่าที่จะใช้หลาย ๆเพิ่มเติมเรือเล็กแทน มวลสารทั้งหมดของสายเคเบิลประมาณ 7200 ตัน ซึ่งอยู่ในขอบเขตของมหาสมุทรขนาดใหญ่เรือ .ในแง่ของเวลาการทำงาน มันได้ถูกประเมิน โดย vryhofเบรกที่ใช้เวลาหนึ่งวันเพื่อติดตั้งเดียวจอดเรือมะนาว รวม 30 จุดจะต้องจอดเรือสำหรับมหาสมุทรทำความสะอาดอาร์เรย์ ( 29 สำหรับ booms 1 สำหรับแพลตฟอร์ม ) , ความหมายเวลาการใช้งานทั้งหมด 90 วันอย่างไรก็ตาม การขนส่งไปยังและจากสถานที่จะต้องเวลายังสามารถถ่ายลงในบัญชีเพื่อทำลายต้นทุนเหล่านี้จะถือว่าเป็นเช่นเดียวกับการติดตั้ง
การแปล กรุณารอสักครู่..