represent the suggested process chart for
inspector 1 and inspector 2, respectively, while Table 5 represents
the summary of both inspectors. It was clear that the duties
of inspector 2 (13 operations) were more than the duties of
inspector 1 (6 operations) but the process time was approximately
balanced.