Check the quality conditions of the access door assembly inspection plan "comprising" will be reserved for the production planning. According to the basic requirements of quality concepts Q / KS for equipment assembly. consists of inspecting all scheduled inspections content. Place of inspection (QG or Q- station) as well as time and monitoring capacity, depending on the actual situation and / or criticism of other sensors, such as CS3 / CS4 additional monitoring activities need to be explained. The content in dynamic monitoring plan. Coordinate and monitor the implementation of control systems, two items are under the responsibility of QA - in the planning, engineering, manufacturing QA - engineering is done with the producers of MBC's management and QM Engineering Tools are. CGIs still below the CS 2 checklist in the general scope of the audit, the Audit Office on corruption code.
การแปล กรุณารอสักครู่..
