• Monitoring: Use digital thermometer to check the internal temperature of one product per batch from the warmest part of the walk in cooler within 2 hours of reaching 140F and again within 4 hours of reaching 70F.
• Corrective Action: If temperature is not cooled to 70F within 2 hours of reaching 140F, reheat to 165F and try another method to rapidly cool product as required or discard product. If product is not cooled to 41F within 4 hours of reaching 70F, discard. Adjust processes as necessary.
• Records: Document on Batch Record. Update HACCP Plan as necessary.
• Verification: Manager on Duty will verify that designated employees have taken the required temperatures by visually monitoring employees during their shift and reviewing the Batch Log on a weekly basis.