The Performing Authority should explain the results of the Risk Prediction to the Permit Issuer. The Permit Issuer should:
• Visit the work area(s) with the Performing Authority;
• Review the proposed work and local situation;
• Review and discuss the Risk Prediction and proposed controls;
• Ensure that all risks have been identified and that the proposed controls are sufficient to enable the job to be done safely.