To building the coved walkway from college 10th to central main bus stop. According from the figure3, the figure show 98% of student agree with our project to build the covered walkway. We use Roof 2387 sheets, 30 bags of cement, 200 wire of iron, 100 bar of Pole, a ton of soil , and 10 tank of paint. The Expert Standard Covered Walkway and Canopy system is based on the heavy duty system with lighter section, ideal for when quality, robust design. Frist, we are present project and get approved. Then survey and record the length / position of service areas such as undergrounded water tank which will prevent from operating accident. Then, destroy weeds and trash then adjust the soil level in order to flow the water and prevent from water logged. Next, make a pile or build the structure to hold the weight. In case of using cement, it has to dry in order to do the next process. After that we establish shoulder pole which is iron box or shaped iron, and set up the roof metal sheet metal sheet coated with spiral zinc and color coated that has less connected point. It can press to layer which reduce leaking problem. Finally, revise the result.