34.2.4 Procedure After Bunkering
a) Prior to disconnecting any delivery hose, the Chief Engineer is to lines are blown through with comp air, to prevent oil spills when dismantling connections and hoses.
b) Chief Engineer to ensure that all bunkering connection and valves including all sounding caps are properly closed.
34.2.5 Procedure For oil Transferring a)
Three Engineers will be required to be on duty for normal oil transfer within the vessel, with assigned duty as follows overall in-charge of oil transfer operation.
i) Chief Engineer
ii) 2nd Engineer to supervise the oil transfer operation. In-charge of sounding and transferring operations in
iii) 3rd or 4th Engr the engine room.