The methodology developed is used a case study from the offshose oil industry. The study analyzed a remotely operated underwater robot performing a critical ring assembly installation task on a subsea wellhead. Although this is a specific and somewhat unique operational setting,the same analytical method can be applied to any time-critical situation,whether it involves producing a product,rendering a service or some other application need.