The leading manufacturer’s “low emissions” graphite design failed on the 89th mechanical cycle and on average every 125 cycles throughout the testing. Repeated maintenance was required between each failure to readjust the valve packing
The leading manufacturer’s“low emissions” graphite design failed on the89th mechanical cycle and on average every125 cycles throughout the testing. Repeatedmaintenance was required between each failureto readjust the valve packing