Figure 2 is an example of the integration and the baseline correction windows for a peak doublet with a valley
between, where only one of the peaks is integrated. The SI and the SB are identical but the EI and the EB are
different. The second peak is not required for the baseline correction of the first peak. In the Min-Max method,
each peak is fully defined, so not dependent on any other peak in the analysis.