1.0 GENERAL
1.1 Full legal title of Ultimate Parent or Holding Company
………………………………………………………………………………………
1.2 Registered/Main Office of Ultimate Parent or Holding Company
Address ………………………………………………………………….
………………………………………………………………….
………………………………………………………………….
………………………………………………………………….
Telephone No. ………………………………………………………………….
Fax No. …………………………………………………………………
Email …………………………………………………………………
1.3 Full legal title of Contractor
....................................................................................................................…………
1.4 Legal status of Contractor - whether a Private of Public Limited Liability Company, Partnership, Consortium / Joint Venture etc.
.............................................................................................……………………………….
1.5 Registered Office and / or other legal full address of Contractor
Address ………………………………………………………………….
………………………………………………………………….
………………………………………………………………….
………………………………………………………………….
Telephone No. …………………..…………………………………………….
Fax No. …………………………………………………………………
2.0 ACTIVITIES
2.1 Main activities of Contractor over last five years.
Note i) Include a maximum of five items only
ii) Specify approximate value for each activity during five year period (US $ or Thai Baht, please specify)
1 Anticorrosive Linings (AC) ($..….........................)
2 Asbestos Removal (AS) ($..….........................)
3 Bolt Tensioning (BT) ($..….........................)
4 Buildings (BS) ($..….........................)
5 Catalyst Services (CS) ($……………………..)
6 Cathodic Protection (CP) ($……………………..)
7 Chemical Cleaning (CC) ($……………………..)
8 Chimney / Stack (Supply / Erect) (CS) ($..….........................)
9 Civils (General) (CI) ($..….........................)
10 Clean Room (Supply/Construct) (CR) ($……………………..)
11 Commissioning of Plant (IP) ($..….........................)
12 Construction Equipment Hire (PT) ($..….........................)
13 Cooling Towers (Supply / Erect) (CT) ($..….........................)
14 Cranes and Heavy Lift (LI) ($……………………..)
15 Demolition (DM) ($..….........................)
16 Electrical Installation (EL) ($..….........................)
17 Fire Proofing/Protection (FP) ($..….........................)
18 Flares (Supply/Erect) (FL) ($……………………..)
19 Grit, Shot and Sand Blasting (GB) ($............) waiting data from K.Noi
20 Ground Improvement (GI) ($……………………..)
21 Heat Treatment (HT) ($..….........................)
22 Heaters and Vessels (HR) ($..….........................)
23 Instrument Installation (IN) ($..….........................)
24 Insulation (IS) ($..….........................)
25 Labour Broker (LB) ($..….........................)
26 Marine Construction including Jetties (JE) ($……………………..)
27 Mechanical Services/HVAC Installation (HE) ($..….........................)
28 Non - Destructive Testing (ND) ($..….........................)
29 Painting (piework,vessels, etc) (PA) ($..…...........)waiting data from K.Noi
30 Piling (PL) ($..….........................)
31 Pipeline Laying (PL) ($..….........................)
32 Pipework Fabrication (Offsite) (PP) ($..….......560,000......) for 2015 only
33 Pipework Fabrication (Onsite) (PO) ($..….........................)
34 Pipework Erection (PE) ($..….........................)
35 Refractory Lining (RE) ($……………………..)
36 Road Construction (RO) ($……………………..)
37 Scaffolding (SF) ($..….........................)
38 Security Services (SE) ($……………………..)
39 Site Preparation (SP) ($..….........................)
40 Steelwork Fabrication (Offsite) (SH) ($..….......3000...........) for 2015 only
41 Steelwork Fabrication (Onsite) (SO) ($..….........................)
42 Steelwork Erection (SE) ($..….........................)
43 Tankage and Spheres (TK) ($..….........................)