Bang Pakong Combined Cycle (Unit l-2 Replacement) Project Technical Document Design Criteria Janitor Room Second Floor Printer Room Janitor room Shift Supervisor’s Room Programming / Server Room Toilet/Bathroom for Men . Locker Room for Men Approximated Size (m) 5 Section 2A.9 ’ 1.5 x2.0 Equipment Room 200 X 100 Central Control Room ; 200 X 10_0 § 4.0 x 4.0 4.0 X 4.0 8.0 X 10.0 Lunch and Pantry Room ; 6_O X 8_0 To be detennined referring to I Section 2A.9 5 For 24 Locker E 1.5 x2.0 Design criteria of areas and rooms in the Central Control Building shall be as follows. Entrance Doors Floor finish Skirting Wall finish Ceiling Conidor Floor finish Skirting Wall finish Ceiling Aluminum door (double leaf doors with 6 mm thick tinted glass) Ceramic floor tile Aluminum skirt (min. 0.10 m high) Masonry wall with plastering and painting Suspended, exposed grid, acoustical type Ceramic floor tile Aluminum skirt (min. 0.10 m high) Masonry wall with plastering and painting Suspended, exposed grid, acoustical type T '7 Volume 2 Page 2A-8