1. In view of your academic disciplines, what are main challenge(s) of the construction of this bridge?
The main challenge of this project is many. Such as
1.1 Place of construction because place in the construction the more challenging it is to the sea. To calculate were very well designed. Therefore impact on the budget for construction of a higher value. Such as
- Engineers were working class; there is a risk to run a lot. It has been paying a high price.
- Cement can’t normally require special cement. Must withstand the corrosive sea water were to dry quickly.
1.2 Tools and equipment
The construction of a large and the challenge is high must using larger machines this rare
Questions
2. If you could back design the construction, operation, or management to this bridge, what would you have done to meet with the above mentioned challenges?
- Study the terrain .Such as
- Time and tide to speed up construction
- Season during the study, rainy, winter is over. Will select works correctly.
- Study habits of colleagues Who does not like anything. Always use good words and always melodic.