For the variables in Factor 3, Ground Resources, all the routes
range over a wide spectrum of values. Routes 4 and 5 show the
highest probability of contaminating two of the state’s largest
aquifers. Regarding the Geology variable, Routes 4 and 5 may
encounter difficulties in construction with due to geologic suitability.
Table 7 summarizes the result