A new method namely, level-sum method based on the multi-objective linear
programming and the simplex method is proposed for computing an optimal fuzzy
solution to a fuzzy linear programming problem inwhich fuzzy ranking functions are
not used. The level-sum method is illustrated by numerical examples.